NEO-PROJECT LINEAR

NEO-Project Linear

Advanced Linear Scheduling & Infrastructure Visualization for Excel and Primavera P6

NEO-Project Linear is a powerful linear scheduling and project visualization add-in developed for infrastructure, transportation, utility, railway, pipeline, roadway, tunnel, and corridor-based construction projects.

Built within the NEO-Project ecosystem, the platform transforms Primavera P6 and Excel schedule data into dynamic linear schedules and time-location visualizations, helping project teams better understand sequencing, production flow, work fronts, and spatial project coordination.

Designed specifically for linear and repetitive construction projects, NEO-Project Linear provides advanced visualization capabilities similar to specialized linear scheduling platforms directly inside Microsoft Excel.

NEO-Project Linear

Linear Scheduling & Time-Location Planning

Linear Scheduling Features

NEO-Project Linear enables project teams to create professional linear schedules and time-location diagrams from Primavera P6 schedules and Excel-based project data.

  • Time-location diagrams
  • Linear Gantt visualization
  • Corridor-based project planning
  • Chainage and station-based scheduling
  • Production rate visualization
  • Crew movement tracking
  • Workfront coordination
  • Location-based sequencing
  • Linear activity mapping
  • Multi-segment project visualization

Infrastructure Project Visualization

Ideal for location-based projects

Designed for projects where location and sequencing are critical to project success.

  • Highways and roads
  • Rail and transit systems
  • Pipelines
  • Tunnels
  • Utility corridors
  • Bridges
  • Transmission lines
  • Airport infrastructure
  • Large-scale earthworks
  • Repetitive construction operations

Dynamic Project Coordination

Visualization & Coordination Features

NEO-Project Linear helps project teams visually identify conflicts, inefficient sequencing, and workfront overlaps before they impact field operations.

  • Workfront clash detection
  • Crew spacing analysis
  • Parallel operation review
  • Production continuity monitoring
  • Possession and access visualization
  • Time-distance coordination
  • Delay impact visualization
  • Shift and phase mapping
  • Zone and segment management
  • Multi-contractor coordination views

Integrated with Primavera P6 & Excel

Move from CPM schedules to linear visualization

NEO-Project Linear works directly with Primavera P6 schedules, XER imports through NEO-Project Toolbox, Excel project data, linear work breakdown structures, production-based activity logic, and infrastructure schedule updates.

The platform enables planners and schedulers to move from traditional CPM schedules to advanced linear visualization workflows without leaving the Microsoft Excel environment.

  • Primavera P6 schedules
  • XER imports through NEO-Project Toolbox
  • Excel project data
  • Linear work breakdown structures
  • Production-based activity logic
  • Infrastructure schedule updates

Built for Modern Infrastructure Scheduling

More than traditional CPM Gantt charts

Linear projects require more than traditional CPM Gantt charts. NEO-Project Linear helps organizations improve infrastructure planning, visualize project sequencing, and support recovery and mitigation planning.

  • Improve infrastructure planning
  • Visualize project sequencing
  • Optimize production flow
  • Reduce workfront conflicts
  • Improve schedule communication
  • Enhance field coordination
  • Support recovery and mitigation planning
  • Improve stakeholder understanding

Why NEO-Project Linear?

Excel flexibility with advanced linear scheduling

Traditional scheduling tools often struggle to clearly represent linear and corridor-based projects.

NEO-Project Linear combines the flexibility of Excel with advanced linear scheduling and visualization capabilities, creating a practical and highly accessible solution for modern infrastructure project teams.

  • Advanced linear scheduling
  • Time-location visualization
  • Accessible Excel-based workflows
  • Corridor and segment planning
  • Production flow insight
  • Clearer stakeholder communication

Built For

Built for Infrastructure Professionals

  • Infrastructure Schedulers
  • Project Controls Teams
  • Transportation Authorities
  • Rail and Transit Projects
  • Highway Contractors
  • Pipeline and Utility Projects
  • Construction Managers
  • Planning Engineers
  • Linear Infrastructure Consultants
  • Large Program Delivery Teams

Visualize infrastructure schedules with NEO-Project Linear

Create a free account or contact us to learn how NEO-Project Linear can support your infrastructure planning and time-location scheduling workflow.